Transmission lines

With our privately own excavating, rock crushing and earth moving equipment, we are capable of constructing our own access roads to any construction site. 

Equipment and materials are transported with our privately owned fleet of tractors with flatbed trailers.      

We employ innovative methods and utilise our own specialised equipment that accelerate the construction of the bases and the erection of the steel lattice towers. 

Further, our specialised conductor-stringing equipment assures the integrity of the conductors while avoiding underlying obstacles, through “Stringing-Under-Tension”, whether under 1.5tn, 2.5tn, 7tn or 13tn tension values.

The processes of conductor sagging & termination, further sped-up the completion of the T.L. by use of special bucket trucks capable of reaching heights of up to 70 meters, reducing thus to a minimum the dangers of working exposed to great heights, while increasing productivity in the process.

1/ Road construction

2/ Foundations

3/ Base leveling

4/ Tower erection

5/ Conductor stringing